Showing posts with label kegging. Show all posts
Showing posts with label kegging. Show all posts

Tuesday, April 12, 2011

8 kegs wasn't quite enough

Upgraded the force carbing rig to add the additional 10g of IPA that finished dry hopping last night!

Only 5g left to be prepped - the Vanilla Bourbon Porter - easily the most complex of the beers we made.   I feel like this has been a massive task and it's finally winding down.

All that is left is that 5g, then figuring out the logistics of cooling and serving.

Photobucket

Monday, February 28, 2011

Realistic kegging needs for 50 gallons of beer

I will need 10 kegs total.

I own four right now, and I think I will order an additional four for $160. I plan on borrowing the other 2.

Now, I will only have a 3 tap kegerator (more to come on that, it's only a one tap today)

So I only need liquid hookups for 3 kegs, but for carbonating, I will need to find a way to pressurize all 10!

Ordering about 6 barbed disconnects for $7 each. Going barbed for this, I am going MFL when I build a keezer (after the wedding)

Now, I only have a single regulator now and a 3 way valve, that will have to suffice. I may step up and get this additional 4 way distributor.

CO2 tank -> 3 way valve -> five of these tee's = ten kegs charging.

Of course, I will also need to get some additional tubing to run all of this, and some small worm clamps.
blogger
Most of the CO2 charging will occur at room temperature, as I don't have cold capacity for 10 kegs and the CO2 tank anywhere.